• 11/10/26

Installation Of Magislide Bypass 2 Panel

00:00 - 00:24 1. Measure the door opening and trim the pre-cut metal track for an exact fit.

00:25 - 00:51 2. LEVEL THE TRACK before fastening. Track must be level for doors to operate properly. Set track at least 1/2" back from face of wall before anchoring to ceiling or header with suitable fasteners (supplied by others).

00:52 - 1:06 3. With doors lying flat, position the Adjustable Hanger Brackets to the back side of the doors 1-1/4" from each edge. (2 per door panel). Lightly fasten the Hanger Bracket to the door with (2) #8 X 5/8" Phillips - in the elongated screw slot. DO NOT install Lock Screws in the outer holes at this time.

01:07 - 01:20 4. Hang rear door panels first. Tilt the bottom of the panel outward into the room and place. Hanger Bracket Rollers into the rear Track Roller Guide. Repeat the same process for the front door panels, using the front Track Roller Guide.

01:21 - 01:48 5. Position Floor Guide # 116 parallel to and directly below door panels and Top track. Before fastening permanently to the floor, check the plumb of the doors hanging from the tracks, when in both open and closed positions. Doors will overlap by 1/2" when closed.

01:49 - 02:10 6. Align door panels for correct vertical positioning and leveling. When the door is aligned, tighten the adjustment screws and install Lock Screws in the outer holes at this time using a #8 X 5/8" screw inserted through the remaining round hole in the bracket.

02:11 - 02:28 7. Mount the rubber-tipped Door Stop on the back side of the FRONT door panel, 4" in from the door opening edge and directly above the Door Pull.

02:29 - 03:05 8. Install the #2165 Track Stop on the backside of the track on 3 panel openings to the right of the center door. On the 4-panel openings, attach the track stops on the backside of the track in the center of the opening.

Previous

How To Measure your Magiglide Bifold Opening

Next

Installation Of 1-1/8" Magiglide 2 Panel Standard Bifold